CHOC (Children's Hospital of Orange County)

MORE PHOTOS

CLIENT

Children's Hospital of Orange County

CONTRACT
TYPE

Lump Sum, Firm Fixed

HIGHLIGHTS

Building Demolition, Asbestos Abatement, Waste Management, Materials Recycling, ZERO OSHA Recordables

Project Completed in August 2008

 

Increment-1: Making way for Tower-II at Children's Hospital of Orange County. Prime Contractor, Aman Environmental Construction (Aman), performed the demolition of a 7-story Medical Office Building (MOB) and the removal of an associated 2-level parking garage located in the City of Orange, CA.

Work included:

  • Isolation and demolition of a pedestrian bridge providing access to the south campus over La Veta and removing an 8-story stairway from the exterior of Tower-1
  • Abatement of Asbestos Containing and removal of all Regulated Building Materials
  • Designing and execution of Traffic Management and Controls
  • Site Security and fencings
  • Major tasks: Interface with public agencies and obtain required permits. Safe-off of existing utility systems, telecommunications, fire sprinklers, and storm drain lines. Providing as-builts, surveying of existing site conditions and implementation of Storm Water Pollution Prevention Plan.
  • For safety to the public, Aman provide a number of pedestrian walk covers and barricades. Installed new guard rails on 3-levels of the existing 5-story parking garage, placed scaffolding full height of the MOB – which protected workers and the public, the draped scaffold help control dust, while protecting the environment.
  • Waste Management: 85% of all demolished materials were diverted for recycling.